13/11: The ride stands on East side, outside the Jungle Jive, for the last time.
|

15/11: The tower is on its way.
|

15/11: Another shot of the tower.
|

15/11: Sections of the ride are jet washed.
|

19/11: The tower under the bridge.
|

19/11: The top and the control box, still yet to be moved.
|

19/11: The exit steps and some hydraulic bits.
|

19/11: The top.
|

22/11: The seat section in pieces.
|

24/11: The frame after shotblasting.
|

28/11: Seats stored by the bridge.
|

1/12: The seat frame's been painted pink.
|

3/12: Another shot of the seat pieces by the bridge.
|

6/12: The repainted fence sections sitting on the Jollys platform.
|

6/12: Here is where the ride is going to go, the former site of the Goblets sideshow.
|

6/12: The seat section is back together, and the tower's been painted pink.
|

6/12: The seats are moved to the new location.
|

6/12: The seats being moved.
|

6/12: The seats arrive by the Whip.
|

6/12: An overview of the new ride area.
|

6/12: The tower and side panels by the workshop.
|

7/12: The tower has been moved to the new location.
|

7/12: The top and control box are still at the old site.
|

7/12: Tower and platform side panels outside the food bar.
|

10/12: An overview of the ride's progress.
|

10/12: This gap is where the control box will go.
|

10/12: Bits of the ride waiting to be added.
|

10/12: The ride's entrance sign.
|

10/12: Looking through the bottom of the tower.
|

10/12: A shot of how the whole ride's looking at this point.
|

13/12: The top has been repainted.
|

15/12: Here's the new ride logo on the top section.
|

17/12: The control box has joined the rest of the ride.
|

17/12: The ride's engine.
|

17/12: A closer look at the top and the new logo.
|

20/12: The cables have been installed.
|

20/12: Work begins attaching the side panels to the tower.
|

21/12: Finishing touches.
|

24/12: The ride's complete!
|
|